|
|
Número de pieza | CS-800 | |
Descripción | OPERATION MANUAL | |
Fabricantes | ELTRA | |
Logotipo | ||
Hay una vista previa y un enlace de descarga de CS-800 (archivo pdf) en la parte inferior de esta página. Total 60 Páginas | ||
No Preview Available ! OPERATION MANUAL CS-800
as from serial no. 1557040811
1 INSTALLATION
1.1 Setting up
1.2 Front panel illustration
1.3 Mains power connection
1.4 Data interfaces
1.5 Gas connections
1.6 Connecting the gas purification furnace
1.7 Auto loader
2 ANALYSIS
2.1 Working procedure
2.2 Work breaks
2.3 Preheating the crucibles
2.4 Applications
3 MAINTENANCE
3.1 General information
3.2 Installing and removing the reagent tubes
3.3 Filling the reagent tubes
3.4 Replacing the O-rings
3.5 Replacing the furnace cleaning brush
3.6 Cleaning the dust trap
3.7 Replacing the combustion tube
3.8 Replacing the generator tube
3.9 Changing the combustion coil
3.10 Removing the pedestal
3.11 Checking for gas leaks
4 DESCRIPTION OF FUNCTIONS
4.1 Measuring principle
4.2 Gas flow system
4.3 Infrared cell
4.4 Furnace
5 MISCELLANEOUS
5.1 Ordering numbers
5.2 Packing
5.3 CS-800 pre-installation guide
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
0
Free Datasheet http://www.datasheet4u.com/
1 page 1.4 Data interfaces
3
4
21
5 67
Rear side of UNI 1.3 board:
2-3-1
1 Micro-controller programming lock (remove for programming)
2 Micro-controller programming connection (LPT-interface)
3 Balance connection (serial)
4 PC connection (serial interface (COM-port))
5 Analog input/output signals
6 Digital input/output signals
7 Autoloader connection
When all the units are connected to the mains power, then data connections can be made.
The plugs are all different from each other, so that they cannot be interchanged. The required
data cables are included if the additional units are supplied. These are adapted to the
interfaces when the analysers are put into operation in our company.
As the balance transfers the weight to the analyser, its serial interface must be programmed.
The computer is already provided with an operating system and software for controlling the
analyser.
NOTE: For all instructions on operating the PC software refer to the Help-function of
the software.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
1.4-1
Free Datasheet http://www.datasheet4u.com/
5 Page Double peaks mean incomplete combustion.
The reason is, that either the sample doesn't contain enough iron or the sample is made up
of metal powders.
In this case take 2 grams of tungsten instead of 1.5 gram. If the combustion still provides
double peaks or there is yellow dust on the surface of the crucible after the analysis, take 1g
of tungsten, 500 mg pure Iron and 500 mg of sample.
In case of metal analysis the dust trap has to be cleaned and the moisture trap has to be
replaced every 100 analyses or at least every two days. See 3.1.
The combustion tube doesn't need any cleaning by the operator, due to the automatic
cleaning after each analysis.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
2.1-3
Free Datasheet http://www.datasheet4u.com/
11 Page |
Páginas | Total 60 Páginas | |
PDF Descargar | [ Datasheet CS-800.PDF ] |
Número de pieza | Descripción | Fabricantes |
CS-800 | Full Duplex Interconnect | CONNECT SYSTEMS |
CS-800 | OPERATION MANUAL | ELTRA |
Número de pieza | Descripción | Fabricantes |
SLA6805M | High Voltage 3 phase Motor Driver IC. |
Sanken |
SDC1742 | 12- and 14-Bit Hybrid Synchro / Resolver-to-Digital Converters. |
Analog Devices |
DataSheet.es es una pagina web que funciona como un repositorio de manuales o hoja de datos de muchos de los productos más populares, |
DataSheet.es | 2020 | Privacy Policy | Contacto | Buscar |