DataSheet.es    


PDF CS-800 Data sheet ( Hoja de datos )

Número de pieza CS-800
Descripción OPERATION MANUAL
Fabricantes ELTRA 
Logotipo ELTRA Logotipo



Hay una vista previa y un enlace de descarga de CS-800 (archivo pdf) en la parte inferior de esta página.


Total 60 Páginas

No Preview Available ! CS-800 Hoja de datos, Descripción, Manual

OPERATION MANUAL CS-800
as from serial no. 1557040811
1 INSTALLATION
1.1 Setting up
1.2 Front panel illustration
1.3 Mains power connection
1.4 Data interfaces
1.5 Gas connections
1.6 Connecting the gas purification furnace
1.7 Auto loader
2 ANALYSIS
2.1 Working procedure
2.2 Work breaks
2.3 Preheating the crucibles
2.4 Applications
3 MAINTENANCE
3.1 General information
3.2 Installing and removing the reagent tubes
3.3 Filling the reagent tubes
3.4 Replacing the O-rings
3.5 Replacing the furnace cleaning brush
3.6 Cleaning the dust trap
3.7 Replacing the combustion tube
3.8 Replacing the generator tube
3.9 Changing the combustion coil
3.10 Removing the pedestal
3.11 Checking for gas leaks
4 DESCRIPTION OF FUNCTIONS
4.1 Measuring principle
4.2 Gas flow system
4.3 Infrared cell
4.4 Furnace
5 MISCELLANEOUS
5.1 Ordering numbers
5.2 Packing
5.3 CS-800 pre-installation guide
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
0
Free Datasheet http://www.datasheet4u.com/

1 page




CS-800 pdf
1.4 Data interfaces
3
4
21
5 67
Rear side of UNI 1.3 board:
2-3-1
1 Micro-controller programming lock (remove for programming)
2 Micro-controller programming connection (LPT-interface)
3 Balance connection (serial)
4 PC connection (serial interface (COM-port))
5 Analog input/output signals
6 Digital input/output signals
7 Autoloader connection
When all the units are connected to the mains power, then data connections can be made.
The plugs are all different from each other, so that they cannot be interchanged. The required
data cables are included if the additional units are supplied. These are adapted to the
interfaces when the analysers are put into operation in our company.
As the balance transfers the weight to the analyser, its serial interface must be programmed.
The computer is already provided with an operating system and software for controlling the
analyser.
NOTE: For all instructions on operating the PC software refer to the Help-function of
the software.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
1.4-1
Free Datasheet http://www.datasheet4u.com/

5 Page





CS-800 arduino
Double peaks mean incomplete combustion.
The reason is, that either the sample doesn't contain enough iron or the sample is made up
of metal powders.
In this case take 2 grams of tungsten instead of 1.5 gram. If the combustion still provides
double peaks or there is yellow dust on the surface of the crucible after the analysis, take 1g
of tungsten, 500 mg pure Iron and 500 mg of sample.
In case of metal analysis the dust trap has to be cleaned and the moisture trap has to be
replaced every 100 analyses or at least every two days. See 3.1.
The combustion tube doesn't need any cleaning by the operator, due to the automatic
cleaning after each analysis.
Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800
2.1-3
Free Datasheet http://www.datasheet4u.com/

11 Page







PáginasTotal 60 Páginas
PDF Descargar[ Datasheet CS-800.PDF ]




Hoja de datos destacado

Número de piezaDescripciónFabricantes
CS-800Full Duplex InterconnectCONNECT SYSTEMS
CONNECT SYSTEMS
CS-800OPERATION MANUALELTRA
ELTRA

Número de piezaDescripciónFabricantes
SLA6805M

High Voltage 3 phase Motor Driver IC.

Sanken
Sanken
SDC1742

12- and 14-Bit Hybrid Synchro / Resolver-to-Digital Converters.

Analog Devices
Analog Devices


DataSheet.es es una pagina web que funciona como un repositorio de manuales o hoja de datos de muchos de los productos más populares,
permitiéndote verlos en linea o descargarlos en PDF.


DataSheet.es    |   2020   |  Privacy Policy  |  Contacto  |  Buscar